GS PREFABRICATED BUILDING

Ds10

GS PREFABRICATED BUILDING SYSTEM  Known as ‘ GS PreFab ‘ is a combination of Load Bearing composite Structural Insulated Panel (SIP) System and Composite Deck Panel as a Roof without any Column, Lintel and Roof Truss ( Subject to Building Span & Design ).

 Our Role as a System Provider for Fast Track Projects with Energy efficient Building Materials

[ MODERN & FUTURE BUILDING SYSTEM ]

ADVANTAGES :

  • Fast Installation ( Pre Design & assemble On-Site)
  • Light Weight ( No Heavy Machinery Needed )
  • Cool & Comfort (Insulated Roof & Wall )
  • Cost Effective (Fast Construction & Less Labour )
  • Fire Protection ( BS 476 : Part6 & Part 7 )
  • Durability
  • Easy Transportation ( Remote Area Construction )
  • Acoustic Insulation (Equal with Brick Wall)
  • Versatile Surface Finishes ( Paint / Wall Paper/ Tiles/ Decorative Plank and etc )

[ Able to HYBRID with conventional building constructions or any other building System ]

 

APPLICATIONS :

  • Houses / Farm House/ Resort / Chalet
  • Site Offices ( Camp for Huge Construction Sites )
  • Lobotomy ( Temperature Control Rooms )
  • Workers Quarters
  • Surau
  • Toilet Blocks
  • Guard House
  • Classroom
  • TELCO Cabins
  • SOLAR Cabins
  • Pet Houses
  • Garage
  • Store
  • Showrooms

PROJECT REFERENCE :

ANIMAL LABORATORY with OFFICE – UKM ( Kuala Lumpur )

Animal Laboratory

Build Up Area : 3500 Sq Ft
Completion Duration : 6 weeks
Wall System : SIP Panel 60mm Load Bearing Panel ( Insulated Wall ) – GS SIP-W60
Roof : Deck Panel – GS DP-R20
Truss : Light Gauge Truss
Ceiling : Suspended Gypsum Board Ceiling

Reason For Selecting GS PreFab Building System :
Insulation Property ( Required Temperature Control Rooms ) & Fast Track

PROJECT SITE OFFICE – JIMAH POWER PLANT – ( Port Dickson )

Build Up Area : 3500 Sq Ft
Completion Duration : 6 weeks
Wall System : SIP Panel 60mm Load Bearing Panel ( Insulated Wall ) – GS SIP-W60
Roof : Deck Panel – GS DP-R20
Truss : Light Gauge Truss
Ceiling : Suspended Gypsum Board Ceiling

Reason For Selecting GS PreFab Building System :
Fast Track & Energy Efficient ( Insulated Building )

Jimah Power Plant

PLANTATION OFFICE – MAFC Plantation Cameron Highland ( WITH ATTACHED TOILET )

Plantation Office

Completion Duration : 4 weeks
Wall System : SIP Panel 60mm Load Bearing Panel ( Insulated Wall ) – GS SIP-W60
Roof : Deck Panel – GS DP-W20
Truss : Simple MS Truss Support
Ceiling : Nil ( High Ceiling c/w Roof Deck Panel )

Reason For Selecting GS PreFab Building System :
Fast Track & Energy Efficient ( Insulated Building )

CLASS ROOM – Rural Area School Upgrading Project ( Sabah )

Build Up Area : 800 Sq Ft ( 20×40 Ft )
Completion Duration : 3 weeks
Wall System : SIP Panel 60mm Load Bearing Panel ( Insulated Wall ) – GS SIP-W60
Roof : Deck Panel – GS DP-W20
Truss : Simple MS Hollow Section Support
Ceiling : Nil ( High Ceiling c/w Roof Deck Panel )

Reason For Selecting GS PreFab Building System :
Fast Track, Easy Transportation & Energy Efficient ( Insulated Building )

Classroom

OFFICE – Scrap Metal Yard ( Puchong )

Scrap Metal Yard

Build Up Area : 600 Sq Ft ( 20×30 Ft )
Completion Duration : 2 weeks
Wall System : SIP Panel 60mm Load Bearing Panel ( Insulated Wall ) – GS SIP-W60
Roof : Deck Panel – GS DP-R20
Truss : Light Gauge Truss
Ceiling : Suspended Gypsum Board Ceiling

Reason For Selecting GS PreFab Building System :
Fast Track & Energy Efficient ( Insulated Building )

SURAU – ( Seri Kembangan )

Build Up Area : 1500 Sq Ft ( 30×50 Ft )
Completion Duration : 2 weeks
Wall System : SIP Panel 60mm Load Bearing Panel ( Insulated Wall ) – GS SIP-W60
Roof : Deck Panel – GS DP-W20
Truss : Simple MS Truss Support
Ceiling : Nil

Reason For Selecting GS PreFab Building System :
Fast Track & Energy Efficient ( Insulated Building )

Surau

PROJECT OFFICE – PETRONAS ( Bintulu – Sarawak )

Project Office Petronas

Build Up Area : 8000 Sq Ft ( 40×100 Ft ) x 2 Storey
Completion Duration : 10 weeks
Wall System : SIP Panel 60mm Load Bearing Panel ( Insulated Wall ) – GS SIP-W60
Roof : Deck Panel – GS DP-R20
Truss : Light Gauge Truss
Ceiling : Suspended Gypsum Board Ceiling

Reason For Selecting GS PreFab Building System :
Fast Track, Easy Transportation & Energy Efficient ( Insulated Building )

PLANTATION WORKER’S QUARTERS – MAFC Plantation ( Cameron Highland )

Build Up Area : 4000 Sq Ft ( 20×100 Ft ) x 2 Storey [ 2 Blocks ]
Completion Duration : 10 weeks
Wall System : SIP Panel 60mm Load Bearing Panel ( Insulated Wall ) – GS SIP-W60
Roof : Deck Panel – GS DP-W20
Truss : Simple MS Hollow Section Support
Ceiling : Nil ( High Ceiling c/w Roof Deck Panel )

Reason For Selecting GS PreFab Building System :
Fast Track, Easy Transportation & Energy Efficient ( Insulated Building )

Plantation Workers Quarter